Bridge (ID- 1939 ) Inventory Report

BADERI SUSPENSION BRIDGE On Chainage 64.025 of Ramnagar Bhandarpani Amgari Bhorakote Aakhudunga Talli Sati Betalghat Ratora Visalkote Jaina Richi Billekh state highway

Data finalized On 27 Sep 2022

By MANMOHAN SINGH

Last Rated On 29 Nov 2024

Rating 0.14%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : CD Nainital

General

Bridge Type : Pedestrain Bridge
Structure No : 65/1
Feature Intersected : KOSI REVER
Name of Bridge : BADERI SUSPENSION BRIDGE
Nearest Town : KAIRANA
Latitude (Northing) : 29.50813600
Longitude (Easting) : 79.44887200
Construction Year : 1999
Inventory Year : 2022

Geometric

Overall length (in meter) : 125.00
Total No of Span : 1
Maximuam Span (in meter) : 125.00
Span Arragment : 1*125
No of Lane : 1.000
Overall Width (m) : 2.150
Carriageway Width (m) : 2.150
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Mild
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Cable stayed
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Asphaltic Plug Joint
Railing/Crash Barrier type : other
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided