Bridge (ID- 2005 ) Inventory Report

RCC Bridge at chainage 8.025 of UGT motor road On Chainage 8.025 of Uttarkashi Ghansali Tilwara state highway

Data Yet Not Finalized

Last Rated On 09 Jun 2024

Rating 0.08%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : PD Bhatwari

General

Bridge Type : Motor Bridge High Level
Structure No : 8/1
Feature Intersected : Mastadi Nala
Name of Bridge : RCC Bridge at chainage 8.025 of UGT motor road
Nearest Town : Uttarkashi
Latitude (Northing) : 30.70671400
Longitude (Easting) : 78.46859100
Construction Year : 1980
Inventory Year : 2022

Geometric

Overall length (in meter) : 11.00
Total No of Span : 1
Maximuam Span (in meter) : 10.50
Span Arragment : 10.50
No of Lane : 1.000
Overall Width (m) : 4.250
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Tubular steel
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided