Bridge (ID- 202 ) Inventory Report

Bridge on KAMAL NADI at TPN Km 67 On Chainage 67.000 of Tuni Purola Naugaon state highway (SH)

Data Yet Not Finalized

Last Rated On 03 Jul 2026

Rating 3.54%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : CD Purola

General

Bridge Type : Motor Bridge High Level
Structure No : 67/1
Feature Intersected : KAMAL NADI
Name of Bridge : Bridge on KAMAL NADI at TPN Km 67
Nearest Town : Purola
Latitude (Northing) : 30.88058300
Longitude (Easting) : 78.08574200
Construction Year : 1968
Inventory Year : 2021
Work Code(s) : --

Geometric

Overall length (in meter) : 35.50
Total No of Span : 1
Maximuam Span (in meter) : 35.50
Span Arragment : 1X36
No of Lane : 1.000
Overall Width (m) : 4.300
Carriageway Width (m) : 4.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Raft
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided