Bridge (ID- 2034 ) Inventory Report

Guniya Bridge On Chainage 7.900 of Balwakot Payyapodi motor road

Data Yet Not Finalized

Last Rated On 15 Nov 2023

Rating 0.34%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pithoragarh Under Division : CD Askote

General

Bridge Type : Motor Bridge High Level
Structure No : 8/1
Feature Intersected : Guniya River
Name of Bridge : Guniya Bridge
Nearest Town : Guniya
Latitude (Northing) : 29.82244100
Longitude (Easting) : 80.42333000
Construction Year : 1995
Inventory Year : 2022

Geometric

Overall length (in meter) : 29.50
Total No of Span : 1
Maximuam Span (in meter) : 29.50
Span Arragment : 29.5x1
No of Lane : 1.000
Overall Width (m) : 4.750
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : Stone Masonry

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided