Bridge (ID- 2045 ) Inventory Report

Kanjyoti 122m suspension bailey bridge On Chainage 10.050 of Tawaghat Naryan Ashram motor road

Data finalized On 16 Nov 2022

By ANKIT SINGH

Last Rated On 13 Jun 2024

Rating 0.39%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pithoragarh Under Division : CD Askote

General

Bridge Type : Motor Bridge High Level
Structure No : 11/1
Feature Intersected : Dhauli River
Name of Bridge : Kanjyoti 122m suspension bailey bridge
Nearest Town : Dharchula
Latitude (Northing) : 30.01874200
Longitude (Easting) : 80.57160800
Construction Year : 2016
Inventory Year : 2022

Geometric

Overall length (in meter) : 122.00
Total No of Span : 1
Maximuam Span (in meter) : 122.00
Span Arragment : 1x122m
No of Lane : 1.000
Overall Width (m) : 5.000
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Bailey
Superstructure Material : Steel
Wearing Coat Type : Not Provided
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : other
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : other
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided