Bridge (ID- 2047 ) Inventory Report

Palnya bridge near sofkhal On Chainage 19.300 of Maithanaghat Dhour Jakhani Takulsari Rasiyamahadev Sonphkhal Divoli Bandarkot Naulapur motor road

Data finalized On 16 Nov 2022

By KULDEEP GIRI

Last Rated On 29 May 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : CD Baijroo

General

Bridge Type : Motor Bridge High Level
Structure No : 20/1
Feature Intersected : palnya local gadhera
Name of Bridge : Palnya bridge near sofkhal
Nearest Town : baijro, thalisain
Latitude (Northing) : 29.78110000
Longitude (Easting) : 79.11080000
Construction Year :
Inventory Year : 2022

Geometric

Overall length (in meter) : 10.20
Total No of Span : 1
Maximuam Span (in meter) : 10.20
Span Arragment : 1x10.20
No of Lane : 1.000
Overall Width (m) : 6.100
Carriageway Width (m) : 5.200
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.100
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Tubular steel
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : cement concrete provided in water way
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : painting work provided on railing