Bridge (ID- 2065 ) Inventory Report

Steel Girder Bridge On Chainage 194.650 of Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)

Data finalized On 16 Nov 2022

By Er. Mahendra Singh Dawan

Last Rated On 16 Dec 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : PD Pauri

General

Bridge Type : Motor Bridge High Level
Structure No : 195/1
Feature Intersected : Nayar River
Name of Bridge : Steel Girder Bridge
Nearest Town : Banghat Near Satpuli
Latitude (Northing) : 29.94986000
Longitude (Easting) : 78.68852000
Construction Year : 1979
Inventory Year : 2022

Geometric

Overall length (in meter) : 76.60
Total No of Span : 1
Maximuam Span (in meter) : 76.00
Span Arragment : 1x76
No of Lane : 1.000
Overall Width (m) : 5.150
Carriageway Width (m) : 4.950
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.600
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 541.000
OFL Ordinary Flood Level : 539.000
LWL Low Water Level : 534.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 545.700
Road Level at Centre : 546.000
Design Scour Level at Pier :
Design Scour Level at Abutments : 530.000
Exposure Condition : Very Severe
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : Retaining wall
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : Retaining wall
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided