Bridge (ID- 21 ) Inventory Report

Steel Girder Bridge over Kumeda Gad in km 12 On Chainage 12.200 of Khal Sarmola Rano motor road

Data finalized On 07 Dec 2023

By Kuldeep singh Rawat

Last Rated On 06 Jun 2024

Rating 0.79%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : CD Pokhari

General

Bridge Type : Motor Bridge High Level
Structure No : 12/1
Feature Intersected : Kumeda Gad
Name of Bridge : Steel Girder Bridge over Kumeda Gad in km 12
Nearest Town : Nagnath Pokhari
Latitude (Northing) : 30.29816600
Longitude (Easting) : 79.19128900
Construction Year : 2015
Inventory Year : 2023

Geometric

Overall length (in meter) : 36.00
Total No of Span : 1
Maximuam Span (in meter) : 36.00
Span Arragment : 1x36
No of Lane : 1.000
Overall Width (m) : 4.650
Carriageway Width (m) : 4.150
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Wire crates provided
Bank Protection Right Side of Up-stream : plum concrete blocks provided
Bank Protection Left Side of Down-stream : Wire crates provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided