Bridge (ID- 2102 ) Inventory Report

Ban Ganga Bridge On Chainage 26.060 of Roorkee Landhora Laksar Balawali state highway

Data finalized On 17 Nov 2022

By Pardeep kumar/Lalit Mohan Singh

Last Rated On 14 Nov 2023

Rating 0.14%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : CD Laksar

General

Bridge Type : Motor Bridge High Level
Structure No : 27/1
Feature Intersected : Ban Ganga
Name of Bridge : Ban Ganga Bridge
Nearest Town : Laksar
Latitude (Northing) : 29.69500000
Longitude (Easting) : 78.05900000
Construction Year : 1987
Inventory Year : 2020

Geometric

Overall length (in meter) : 120.00
Total No of Span : 4
Maximuam Span (in meter) : 120.00
Span Arragment : 4x30
No of Lane : 1.000
Overall Width (m) : 8.400
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 10.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided