Bridge (ID- 2109 ) Inventory Report

Masau Inter College Bridge On Chainage 33.350 of Thalisain Bhungidhar Deghat Jainal Manila Dotiyal Marchula state highway

Data finalized On 28 Dec 2022

By Yogendra Singh

Last Rated On 31 May 2024

Rating 0.51%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : CD Baijroo

General

Bridge Type : Pedestrain Bridge
Structure No : 33/1
Feature Intersected : Masau Gaad
Name of Bridge : Masau Inter College Bridge
Nearest Town : Jagatpuri
Latitude (Northing) : 29.98078000
Longitude (Easting) : 79.13068000
Construction Year : 2014
Inventory Year : 2022

Geometric

Overall length (in meter) : 14.60
Total No of Span : 1
Maximuam Span (in meter) : 14.00
Span Arragment : 1x14
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 2.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.600
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided