Bridge (ID- 2147 ) Inventory Report

30 m span Valley Bridge in ch. 1.500 On Chainage 1.500 of Roorkee Laksar Balawali road to Kalsia link road

Data finalized On 05 Dec 2022

By Pardeep kumar /Lalit Mohan Singh

Last Rated On 25 Oct 2024

Rating 0.99%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : CD Laksar

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Ban Ganga
Name of Bridge : 30 m span Valley Bridge in ch. 1.500
Nearest Town : Raisi
Latitude (Northing) : 29.67000000
Longitude (Easting) : 78.06000000
Construction Year : 2013
Inventory Year : 2022

Geometric

Overall length (in meter) : 30.50
Total No of Span : 1
Maximuam Span (in meter) : 30.00
Span Arragment : 1x30
No of Lane : 1.000
Overall Width (m) : 6.000
Carriageway Width (m) : 4.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Bailey
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Raft
Pier Foundation Type : Raft
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : other

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided