Bridge (ID- 2175 ) Inventory Report

Chami Bridge On Chainage 3.500 of Chami Buthkhola motor road

Data finalized On 04 Jul 2023

By JE MANISH PANT

Last Rated On 08 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pithoragarh Under Division : PD Pithoragarh

General

Bridge Type : Motor Bridge High Level
Structure No : 27
Feature Intersected : City Naala
Name of Bridge : Chami Bridge
Nearest Town : Pithoragarh
Latitude (Northing) : 29.57000000
Longitude (Easting) : 80.22000000
Construction Year : 2019
Inventory Year : 2022

Geometric

Overall length (in meter) : 24.00
Total No of Span : 1
Maximuam Span (in meter) : 24.00
Span Arragment : 1x24m
No of Lane : 1.000
Overall Width (m) : 5.000
Carriageway Width (m) : 4.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.5
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum Concrete work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : Plum Concrete work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided