Bridge (ID- 2191 ) Inventory Report

Irrigation Canal Ambari

Data finalized On 09 Nov 2023

By Swatantra Kumar AAE

Last Rated On 30 Nov 2024

Rating 0.08%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : NH Dehradun

General

Bridge Type : Motor Bridge High Level
Structure No : 1
Feature Intersected : irrigation canal
Name of Bridge : Irrigation Canal Ambari
Nearest Town : vikasnagaaar
Latitude (Northing) : 30.50517100
Longitude (Easting) : 77.82578400
Construction Year : 1960
Inventory Year : 2022

Geometric

Overall length (in meter) : 9.00
Total No of Span : 1
Maximuam Span (in meter) : 6.00
Span Arragment : 1
No of Lane : 2.000
Overall Width (m) : 13.500
Carriageway Width (m) : 13.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 12.000
Gradient (%age) : 5
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Hard clayey
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided