Bridge (ID- 2204 ) Inventory Report

Padartha Nala Bridge On Chainage 48.500 of Purkazi Laksar Haridwar national highway

Data finalized On 19 Sep 2023

By Mahabir Lal AAE

Last Rated On 08 Nov 2024

Rating 0.96%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : NH Dehradun

General

Bridge Type : Motor Bridge High Level
Structure No : 1
Feature Intersected : Padartha Nala
Name of Bridge : Padartha Nala Bridge
Nearest Town : Haridwar
Latitude (Northing) : 29.83277778
Longitude (Easting) : 78.11833333
Construction Year : 2015
Inventory Year : 2022

Geometric

Overall length (in meter) : 16.20
Total No of Span : 1
Maximuam Span (in meter) : 16.20
Span Arragment : 1x16.200
No of Lane : 2.000
Overall Width (m) : 14.000
Carriageway Width (m) : 10.500
RS Footpath Width (m) : 1.000
LS Footpath Width (m) : 1.000
Approch Width i/c Shoulders (m) : 16.200
Gradient (%age) : 3
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 200.000
OFL Ordinary Flood Level : 150.000
LWL Low Water Level : 100.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided