Bridge (ID- 2206 ) Inventory Report

ROB Laksar On Chainage 31.000 of Purkazi Laksar Haridwar national highway

Data finalized On 10 Jan 2024

By Mahabir Lal

Last Rated On 21 Jun 2024

Rating 2.52%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : NH Dehradun

General

Bridge Type : Road Over Bridge
Structure No : 31/1
Feature Intersected : Laksar
Name of Bridge : ROB Laksar
Nearest Town : Laksar
Latitude (Northing) : 29.74888889
Longitude (Easting) : 78.02388889
Construction Year : 2009
Inventory Year : 2022

Geometric

Overall length (in meter) : 546.90
Total No of Span : 27
Maximuam Span (in meter) : 25.50
Span Arragment : 12x19.60+3x25.50+12x19.60
No of Lane : 2.000
Overall Width (m) : 7.500
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 3
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Mastic asphalt
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Pile
Pier Foundation Type : Pile
No of Piers : 26
Abutment Type : RCC counterfort type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided