Bridge (ID- 2228 ) Inventory Report

Steel truss Pedestrian bridge over Bhagirthi river at Naluna

Data Yet Not Finalized

Last Rated On 23 Nov 2024

Rating 1.93%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : PD Bhatwari

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Bhagirathi River
Name of Bridge : Steel truss Pedestrian bridge over Bhagirthi river at Naluna
Nearest Town : Naluna
Latitude (Northing) : 30.75619400
Longitude (Easting) : 78.57905400
Construction Year : 2020
Inventory Year : 2020

Geometric

Overall length (in meter) : 110.00
Total No of Span : 1
Maximuam Span (in meter) : 110.00
Span Arragment : 1x110M
No of Lane : 1.000
Overall Width (m) : 2.500
Carriageway Width (m) : 2.100
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 3.000
Gradient (%age) : 1
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1436.917
OFL Ordinary Flood Level : 1432.700
LWL Low Water Level : 1431.500
Design Velocity (m/Sec) : 21.51
Design Discharge (Cumecs) : 1460.00
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Not Provided
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : other
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided