Bridge (ID- 2284 ) Inventory Report

PADESTRAIN BRIDGE OVER JHANGDA GAD AT TANAKPUR ASKOT BRIDLE ROAD

Data finalized On 21 Nov 2022

By HARISH KUNWAR

Last Rated On 20 Jun 2024

Rating 0.72%

Categorized As

XXXXX on XX-XX-XXXX

In District : Champawat Under Division : CD Lohaghat

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : JHANGDA GAD
Name of Bridge : PADESTRAIN BRIDGE OVER JHANGDA GAD AT TANAKPUR ASKOT BRIDLE ROAD
Nearest Town : GHAT
Latitude (Northing) : 29.48145300
Longitude (Easting) : 80.14262500
Construction Year : 1992
Inventory Year : 2022

Geometric

Overall length (in meter) : 17.00
Total No of Span : 1
Maximuam Span (in meter) : 17.00
Span Arragment : 1X17M
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Not Provided
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided