Data finalized On 22 Dec 2023
By Himanshu pandey
Last Rated On 06 Jun 2024
Rating 0.00%
Categorized As
XXXXX on XX-XX-XXXX
In District : Pauri Under Division : CD Paboo
General
Bridge Type :
Pedestrain Bridge
Structure No :
1/1
Feature Intersected :
Pachimi Nayar
Name of Bridge :
Pabou Paali ke Madya Paidal Setu
Nearest Town :
pabou
Latitude (Northing) :
30.09848000
Longitude (Easting) :
78.88307000
Construction Year :
1994
Inventory Year :
2022
Geometric
Overall length (in meter) :
45.00
Total No of Span :
1
Maximuam Span (in meter) :
45.00
Span Arragment :
1x45
No of Lane :
1.000
Overall Width (m) :
1.800
Carriageway Width (m) :
1.800
RS Footpath Width (m) :
0.000
LS Footpath Width (m) :
0.000
Approch Width i/c Shoulders (m) :
2.200
Gradient (%age) :
0
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition :
Moderate
Seismic Importance factor :
1.0
Design Loading :
Class B
Load Rating :
Class B
Super-Structure
Superstructure Type :
Truss
Superstructure Material :
Steel
Wearing Coat Type :
Cement Concrete
Expension Joint Type :
Single Strip/Box Seal Joint
Railing/Crash Barrier type :
other
Bearing type :
POT PIN
Sub-Structure
Founding Strata :
Rocky
Abutment Foundation Type :
Open
Pier Foundation Type :
NA
No of Piers :
0
Abutment Type :
Stone Masonry
Pier Type :
NA
Protection Work
Bank Protection Left Side of Up-stream :
no protection work provided
Bank Protection Right Side of Up-stream :
no protection work provided
Bank Protection Left Side of Down-stream :
no protection work provided
Bank Protection Right Side of Down-stream :
no protection work provided
Floor Protection on Up-stream :
no protection work provided
Floor Protection on Down-stream :
no protection work provided
Tratment for Corrosion Protection (if any) :
no special treatment provided