Bridge (ID- 2412 ) Inventory Report

Suspension Bridge between digra- banderlima over charma river

Data finalized On 23 Nov 2022

By Manish Singh Kharayat

Last Rated On 15 Jun 2024

Rating 3.08%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pithoragarh Under Division : CD Askote

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : charma gad
Name of Bridge : Suspension Bridge between digra- banderlima over charma river
Nearest Town : banderlima, digra
Latitude (Northing) : 29.72446800
Longitude (Easting) : 80.28890500
Construction Year : 2012
Inventory Year : 2020

Geometric

Overall length (in meter) : 50.25
Total No of Span : 1
Maximuam Span (in meter) : 50.00
Span Arragment : 1x50
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 2.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Not Provided
Expension Joint Type : Filler
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : RR Masonry wall provided
Bank Protection Right Side of Up-stream : RR Masonry wall provided
Bank Protection Left Side of Down-stream : RR Masonry wall provided
Bank Protection Right Side of Down-stream : RR Masonry wall provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided