Bridge (ID- 2423 ) Inventory Report

Palpani RCC Bridge On Chainage 302.273 of Delhi Badrinath Mana national highway : .

Data finalized On 04 Jan 2025

By Rooma Bhardwaj

Last Rated On 26 Nov 2024

Rating 2.49%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : NH Srinagar

General

Bridge Type : Motor Bridge High Level
Structure No : 58/46
Feature Intersected : Local Gadhera
Name of Bridge : Palpani RCC Bridge
Nearest Town : Palpani
Latitude (Northing) : 30.18300600
Longitude (Easting) : 78.62488900
Construction Year : 2007
Inventory Year : 2022

Geometric

Overall length (in meter) : 26.50
Total No of Span : 1
Maximuam Span (in meter) : 26.50
Span Arragment : 1*26.50
No of Lane : 2.000
Overall Width (m) : 10.000
Carriageway Width (m) : 9.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 10.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Mild
Seismic Importance factor : 0.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Voided slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : other
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC buttressed type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided