Bridge (ID- 2465 ) Inventory Report

dugadda bridge On Chainage 308.000 of Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway

Data finalized On 02 Jan 2025

By Deepak Gusain

Last Rated On 27 Nov 2024

Rating 0.44%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : NH Srinagar

General

Bridge Type : Motor Bridge High Level
Structure No : 707/23
Feature Intersected : dugadda gadhera
Name of Bridge : dugadda bridge
Nearest Town : dangchaura
Latitude (Northing) : 30.25178750
Longitude (Easting) : 78.71922550
Construction Year : 1981
Inventory Year : 2022

Geometric

Overall length (in meter) : 15.00
Total No of Span : 1
Maximuam Span (in meter) : 15.00
Span Arragment : 1*15.00
No of Lane : 2.000
Overall Width (m) : 7.450
Carriageway Width (m) : 5.850
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.450
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided