Bridge (ID- 2487 ) Inventory Report

gadoliya bridge On Chainage 276.500 of Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway

Data finalized On 02 Jan 2025

By Deepak Gusain

Last Rated On 27 Nov 2024

Rating 1.35%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : NH Srinagar

General

Bridge Type : Motor Bridge High Level
Structure No : 707/18
Feature Intersected : siwadi gadhera
Name of Bridge : gadoliya bridge
Nearest Town : jakhdhar
Latitude (Northing) : 30.36605430
Longitude (Easting) : 78.57499770
Construction Year : 1987
Inventory Year : 2022

Geometric

Overall length (in meter) : 13.30
Total No of Span : 1
Maximuam Span (in meter) : 13.30
Span Arragment : 1*8.00
No of Lane : 1.500
Overall Width (m) : 8.500
Carriageway Width (m) : 5.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Mild
Seismic Importance factor : 0.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Tubular steel
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided