Bridge (ID- 2496 ) Inventory Report

Syansu Bridge On Chainage 1.000 of Syansu Bhenga Chaundhar motor road (ODR)

Data finalized On 29 Nov 2023

By Pramod Negi

Last Rated On 31 Jul 2026

Rating 6.67%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : PD New Tehri

General

Bridge Type : Motor Bridge High Level
Structure No : 4/1
Feature Intersected : Bhagirathi
Name of Bridge : Syansu Bridge
Nearest Town : Syansu
Latitude (Northing) : 30.48609600
Longitude (Easting) : 78.40390200
Construction Year : 2006
Inventory Year : 2022
Work Code(s) : --

Geometric

Overall length (in meter) : 375.00
Total No of Span : 1
Maximuam Span (in meter) : 375.00
Span Arragment : 1x350
No of Lane : 1.000
Overall Width (m) : 3.500
Carriageway Width (m) : 3.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 830.000
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Reinforced concrete
Wearing Coat Type : Mastic asphalt
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided