Bridge (ID- 2550 ) Inventory Report

Suspension bridle bridge at chalthi over ladhiya river

Data finalized On 09 Jan 2024

By Md. Ahmad Raihan

Last Rated On 13 Jun 2024

Rating 18.43%

Categorized As

XXXXX on XX-XX-XXXX

In District : Champawat Under Division : PD Champawat

General

Bridge Type : Pedestrain Bridge
Structure No : 1
Feature Intersected : Ladhiya river
Name of Bridge : Suspension bridle bridge at chalthi over ladhiya river
Nearest Town : chalthi
Latitude (Northing) : 29.19597740
Longitude (Easting) : 80.08494950
Construction Year : 1970
Inventory Year : 2022

Geometric

Overall length (in meter) : 116.50
Total No of Span : 1
Maximuam Span (in meter) : 116.50
Span Arragment : 1x116.50 M
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided