Bridge (ID- 2562 ) Inventory Report

NAGAL SAHSTRADHARA ROAD (NEW )

Data Yet Not Finalized

Last Rated On 15 Feb 2024

Rating 0.58%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : PD Dehradun

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : BARIGAD
Name of Bridge : NAGAL SAHSTRADHARA ROAD (NEW )
Nearest Town : DEHRADUN
Latitude (Northing) : 30.37860100
Longitude (Easting) : 78.09157500
Construction Year : 2014
Inventory Year : 2022

Geometric

Overall length (in meter) : 40.00
Total No of Span : 1
Maximuam Span (in meter) : 40.00
Span Arragment : 1X40
No of Lane : 2.000
Overall Width (m) : 12.000
Carriageway Width (m) : 12.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided