Bilkedar steel bridge On Chainage 1.500 of Ufalda Khandukhal Muchiyali Charakot Jamlakhal Ghurdodi motor road

Data finalized On 29 Nov 2022

By Digvijay Singh

Last Rated On 13 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : CD Srinagar

General

Bridge Type : Motor Bridge High Level
Structure No : 02/02
Feature Intersected : Khandah Gad
Name of Bridge : Bilkedar steel bridge
Nearest Town : kirtinagar
Latitude (Northing) : 30.21532100
Longitude (Easting) : 78.73993800
Construction Year : 1985
Inventory Year : 2022

Geometric

Overall length (in meter) : 36.00
Total No of Span : 1
Maximuam Span (in meter) : 36.00
Span Arragment : 1x36.00
No of Lane : 1.000
Overall Width (m) : 5.000
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 540.000
OFL Ordinary Flood Level : 538.000
LWL Low Water Level : 535.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) : 560.00
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Not Provided
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : other
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided