Bridge (ID- 2636 ) Inventory Report

purola kufara km 3 pedestrain rcc bridge On Chainage 3.000 of Purola Kufara Motor Road.

Data finalized On 05 Dec 2022

By Roshan tamta

Last Rated On 21 Oct 2024

Rating 3.36%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : CD Purola

General

Bridge Type : Pedestrain Bridge
Structure No : 3/1
Feature Intersected : local khad
Name of Bridge : purola kufara km 3 pedestrain rcc bridge
Nearest Town : purola
Latitude (Northing) : 30.88748100
Longitude (Easting) : 78.05074700
Construction Year : 1979
Inventory Year : 2022

Geometric

Overall length (in meter) : 19.70
Total No of Span : 1
Maximuam Span (in meter) : 19.70
Span Arragment : 1*19.70
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 2.100
LS Footpath Width (m) : 2.100
Approch Width i/c Shoulders (m) : 2.100
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Other
Expension Joint Type : Other
Railing/Crash Barrier type : other
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : other
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided