Data Yet Not Finalized
Last Rated On 11 Jun 2024
Rating 1.96%
Categorized As
XXXXX on XX-XX-XXXX
In District : Dehradun Under Division : TD Rishikesh
General
Bridge Type :
Motor Bridge High Level
Structure No :
1/2
Feature Intersected :
Bangala Nala
Name of Bridge :
Bhautowala R.C.C. Bridge
Nearest Town :
Bhautowala
Latitude (Northing) :
30.07765400
Longitude (Easting) :
78.22998700
Construction Year :
2010
Inventory Year :
2020
Geometric
Overall length (in meter) :
40.00
Total No of Span :
3
Maximuam Span (in meter) :
13.60
Span Arragment :
1x13.30,1x13.10,x1x13.60
No of Lane :
1.000
Overall Width (m) :
4.800
Carriageway Width (m) :
4.250
RS Footpath Width (m) :
0.000
LS Footpath Width (m) :
0.000
Approch Width i/c Shoulders (m) :
6.000
Gradient (%age) :
5
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
341.300
OFL Ordinary Flood Level :
340.500
LWL Low Water Level :
339.400
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
344.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition :
Severe
Seismic Importance factor :
0.0
Design Loading :
Class B
Load Rating :
Class B
Super-Structure
Superstructure Type :
T-beam and slab
Superstructure Material :
Reinforced concrete
Wearing Coat Type :
Cement Concrete
Expension Joint Type :
Single Strip/Box Seal Joint
Railing/Crash Barrier type :
Steel rolled section
Bearing type :
other
Sub-Structure
Founding Strata :
Bouldery
Abutment Foundation Type :
Open
Pier Foundation Type :
Open
No of Piers :
2
Abutment Type :
RCC Box type
Pier Type :
other
Protection Work
Bank Protection Left Side of Up-stream :
R.R. Stone Masonry
Bank Protection Right Side of Up-stream :
Wire Crate
Bank Protection Left Side of Down-stream :
R.R. Stone Masonry
Bank Protection Right Side of Down-stream :
R.R. Stone Masonry & Plum Concrete
Floor Protection on Up-stream :
no protection work provided
Floor Protection on Down-stream :
R.C.C. cutoff wall, Plum Concrete
Tratment for Corrosion Protection (if any) :
Down Stream floor continues scouring time to time floor protection work required