Bridge (ID- 2677 ) Inventory Report

Katang Bridge On Chainage 164.200 of starting from Paonta at the junction of NH-72 Connecting Rajban, Shillai in state of Himanchal Pradesh and passing through Minus, Tuini in Uttarakhand and treminating at Hatkoti in Himanchal Pradesh. National Highway

Data finalized On 17 Nov 2023

By Prashant Kumar Aggarwal

Last Rated On 09 Nov 2023

Rating 0.67%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : NH Doiwala

General

Bridge Type : Motor Bridge High Level
Structure No : 1/165
Feature Intersected : Katang Nala
Name of Bridge : Katang Bridge
Nearest Town : Katang
Latitude (Northing) : 30.98944400
Longitude (Easting) : 77.83472200
Construction Year : 1960
Inventory Year : 2022

Geometric

Overall length (in meter) : 10.30
Total No of Span : 1
Maximuam Span (in meter) : 10.30
Span Arragment : 1x10.30
No of Lane : 1.000
Overall Width (m) : 5.000
Carriageway Width (m) : 4.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided