Bridge (ID- 2685 ) Inventory Report

Balliwala Flyover On Chainage 150.300 of Ambala Paunta Shahib Dehradun Rishikesh (Haridwar) national highway

Data finalized On 17 Nov 2023

By Ajendra Rawat

Last Rated On 31 Dec 2023

Rating 1.90%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : NH Doiwala

General

Bridge Type : Fly Over
Structure No : 1/151
Feature Intersected : Balliwala Chowk
Name of Bridge : Balliwala Flyover
Nearest Town : DEHRADUN
Latitude (Northing) : 30.32326100
Longitude (Easting) : 78.01324800
Construction Year : 2016
Inventory Year : 2022

Geometric

Overall length (in meter) : 725.17
Total No of Span : 7
Maximuam Span (in meter) : 34.20
Span Arragment : 2x28.780m + 3x35.000m + 2x28.745m
No of Lane : 2.000
Overall Width (m) : 8.400
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 24.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Pile
Pier Foundation Type : Pile
No of Piers : 6
Abutment Type : RCC spill through type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided