Bridge (ID- 2768 ) Inventory Report

sutoli On Chainage 36.220 of Bageshwar Girechhina Someshwar Dwarahat Bimandeshwar Ida Ranikhet state highway (SH)

Data finalized On 21 Sep 2026

By G S Mahara

Last Rated On 14 Jul 2026

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : CD Almora

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : sutoli gadhera
Name of Bridge : sutoli
Nearest Town : sutoli
Latitude (Northing) : 29.78757300
Longitude (Easting) : 79.58781200
Construction Year : 1983
Inventory Year : 2022
Work Code(s) : --

Geometric

Overall length (in meter) : 14.00
Total No of Span : 1
Maximuam Span (in meter) : 14.00
Span Arragment : 1x12
No of Lane : 1.000
Overall Width (m) : 4.250
Carriageway Width (m) : 3.750
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Pre-cast concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided