Bridge (ID- 2776 ) Inventory Report

70 M Span Suspension Bridge at Jimighat On Chainage 133.000 of Kharbagad Munsyari Bugdiyar bridle road

Data finalized On 28 Dec 2022

By Er. Naval Kishor

Last Rated On 21 Nov 2023

Rating 3.33%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pithoragarh Under Division : PD Didihaat

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Quri
Name of Bridge : 70 M Span Suspension Bridge at Jimighat
Nearest Town : Munsyari
Latitude (Northing) : 30.13462100
Longitude (Easting) : 80.24911100
Construction Year : 2004
Inventory Year : 2022

Geometric

Overall length (in meter) : 70.00
Total No of Span : 1
Maximuam Span (in meter) : 70.00
Span Arragment : 1x70
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Not Provided
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : Stone Masonry
Pier Type : Stone Masonry

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided