Bridge (ID- 278 ) Inventory Report

JHULABAGAR (NANDPARYAG) BRIDGE On Chainage 1.150 of Nandpryag-Devkhal motor road

Data finalized On 04 Jan 2024

By Er Dhani Lal Sah (JE), Er Gyanender Chaudhary (AE)

Last Rated On 01 Jun 2024

Rating 0.34%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : PD Gopeshwar

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Alaknanda River
Name of Bridge : JHULABAGAR (NANDPARYAG) BRIDGE
Nearest Town : Nandparyag
Latitude (Northing) : 30.32639000
Longitude (Easting) : 79.32056000
Construction Year : 1981
Inventory Year : 2021

Geometric

Overall length (in meter) : 65.48
Total No of Span : 1
Maximuam Span (in meter) : 65.48
Span Arragment : 1x65.48
No of Lane : 1.000
Overall Width (m) : 4.850
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Mild
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Asphaltic Plug Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided