Bridge (ID- 280 ) Inventory Report

Suyal Bridge On Chainage 13.043 of Almora Panar national highway

Data finalized On 28 Jul 2022

By Er. Sandeep Kumar (JE)

Last Rated On 03 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : NH Ranikhet

General

Bridge Type : Motor Bridge High Level
Structure No : 14/02
Feature Intersected : Suyal Gadhera
Name of Bridge : Suyal Bridge
Nearest Town : Digoli (Barechhina)
Latitude (Northing) : 29.63406500
Longitude (Easting) : 79.73077700
Construction Year :
Inventory Year : 2020

Geometric

Overall length (in meter) : 16.30
Total No of Span : 1
Maximuam Span (in meter) : 14.60
Span Arragment : 1X15.00
No of Lane : 1.000
Overall Width (m) : 8.300
Carriageway Width (m) : 7.400
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 8.300
Gradient (%age) : 1
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Severe
Seismic Importance factor : 0.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided