Bridge (ID- 2806 ) Inventory Report

kandi-khal -Nala On Chainage 143.100 of Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway

Data finalized On 17 Nov 2023

By Saraswati Sajwan

Last Rated On 16 Nov 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : NH Doiwala

General

Bridge Type : Motor Bridge High Level
Structure No : 1/100
Feature Intersected : kandi -khal-Nala
Name of Bridge : kandi-khal -Nala
Nearest Town : Mussoorie
Latitude (Northing) : 30.50016900
Longitude (Easting) : 78.01163400
Construction Year : 2019
Inventory Year : 2022

Geometric

Overall length (in meter) : 15.00
Total No of Span : 15
Maximuam Span (in meter) : 15.00
Span Arragment : 15
No of Lane : 2.000
Overall Width (m) : 12.000
Carriageway Width (m) : 8.000
RS Footpath Width (m) : 1.000
LS Footpath Width (m) : 1.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided