Bridge (ID- 2814 ) Inventory Report

Bridge Between Dechori Degaon to Musabangar

Data finalized On 13 Dec 2022

By Umashankar Kukreti AAE

Last Rated On 24 Oct 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : CD Ramnagar

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Baur River
Name of Bridge : Bridge Between Dechori Degaon to Musabangar
Nearest Town : Kaladhungi
Latitude (Northing) : 29.36220000
Longitude (Easting) : 79.32800000
Construction Year : 2021
Inventory Year : 2022

Geometric

Overall length (in meter) : 54.00
Total No of Span : 1
Maximuam Span (in meter) : 54.00
Span Arragment : 1x54
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 2.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 4
Skew Angle (degree) : 3.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Other
Railing/Crash Barrier type : other
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Protection work provided
Bank Protection Right Side of Up-stream : Protection work provided
Bank Protection Left Side of Down-stream : Protection work provided
Bank Protection Right Side of Down-stream : Protection work provided
Floor Protection on Up-stream : Protection work provided
Floor Protection on Down-stream : Protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided