Bridge (ID- 2905 ) Inventory Report

Sitapur Parking Bailley Bridge. On Chainage 0.300 of Sitapur Bus Parking Approach Road (Entry Gate)

Data finalized On 12 Apr 2023

By Prasoon Nautiyal

Last Rated On 15 Jul 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : CD Guptkashi

General

Bridge Type : Motor Bridge High Level
Structure No : 4
Feature Intersected : Pati Gadhera
Name of Bridge : Sitapur Parking Bailley Bridge.
Nearest Town : Sitapur
Latitude (Northing) : 30.62100000
Longitude (Easting) : 78.99320000
Construction Year :
Inventory Year : 2020

Geometric

Overall length (in meter) : 30.00
Total No of Span : 1
Maximuam Span (in meter) : 30.00
Span Arragment : 30
No of Lane : 1.000
Overall Width (m) : 4.500
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.2
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Bailey
Superstructure Material : Steel
Wearing Coat Type : Not Provided
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : other

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : protection work provided
Bank Protection Right Side of Up-stream : protection work provided
Bank Protection Left Side of Down-stream : protection work provided
Bank Protection Right Side of Down-stream : protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided