Bridge (ID- 2983 ) Inventory Report

salbagar On Chainage 0.125 of Ambedkar Gram Boora Motor Road (VR)

Data finalized On 07 Jan 2024

By Pushkar Singh mewar

Last Rated On 03 Jun 2026

Rating 0.03%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : PD Karnprayag

General

Bridge Type : Motor Bridge High Level
Structure No : 3/1
Feature Intersected : Nandakini
Name of Bridge : salbagar
Nearest Town : Nandanagar
Latitude (Northing) : 30.28212222
Longitude (Easting) : 79.50098889
Construction Year : 2005
Inventory Year : 2022
Work Code(s) : --

Geometric

Overall length (in meter) : 37.80
Total No of Span : 1
Maximuam Span (in meter) : 37.80
Span Arragment : 1x37.80
No of Lane : 1.000
Overall Width (m) : 4.500
Carriageway Width (m) : 4.200
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided