Bridge (ID- 3034 ) Inventory Report

JHODHAR On Chainage 14.300 of Vijaypur Pharpani road

Data finalized On 09 Jan 2023

By Er. Ved Prakash

Last Rated On 18 Nov 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : PD Nainital

General

Bridge Type : Pedestrain Bridge
Structure No : 1
Feature Intersected : JHODHAR NALA
Name of Bridge : JHODHAR
Nearest Town : Haldwani
Latitude (Northing) : 29.25200100
Longitude (Easting) : 79.63927300
Construction Year :
Inventory Year : 2023

Geometric

Overall length (in meter) : 16.10
Total No of Span : 1
Maximuam Span (in meter) : 16.10
Span Arragment : 1x16.10m
No of Lane : 1.000
Overall Width (m) : 2.300
Carriageway Width (m) : 2.300
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Plate Girder
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided