Bridge (ID- 3048 ) Inventory Report

9 m Span Bhimsi Gadera Pedestrian Bridge On Chainage 21.025 of Masta madmaheshwar Bridle Road

Data finalized On 07 Jul 2023

By er pawan Kumar

Last Rated On 19 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : unknown Under Division : CD Ukhimath

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Bhimsi Gadera
Name of Bridge : 9 m Span Bhimsi Gadera Pedestrian Bridge
Nearest Town : Ukhimath
Latitude (Northing) : 30.59728000
Longitude (Easting) : 79.16363000
Construction Year : 1960
Inventory Year : 2023

Geometric

Overall length (in meter) : 9.00
Total No of Span : 1
Maximuam Span (in meter) : 9.00
Span Arragment : 1x9
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre : 1663.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Raft
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided