Bridge (ID- 3049 ) Inventory Report

13 m Devidhar Gadera Pedestrian Bridge On Chainage 22.475 of Masta madmaheshwar Bridle Road

Data finalized On 07 Jul 2023

By Er pawan kumar

Last Rated On 19 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : unknown Under Division : CD Ukhimath

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Devidhar Gadera
Name of Bridge : 13 m Devidhar Gadera Pedestrian Bridge
Nearest Town : Ukhimath
Latitude (Northing) : 30.60141400
Longitude (Easting) : 79.17327800
Construction Year : 1998
Inventory Year : 2023

Geometric

Overall length (in meter) : 13.00
Total No of Span : 1
Maximuam Span (in meter) : 13.00
Span Arragment : 1x13
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre : 1660.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided