Bridge (ID- 3076 ) Inventory Report

BANJADEVI BRIDLE BRIDGE On Chainage 0.500 of Banjadevi Rikhanikhal bridle road

Data finalized On 27 Sep 2023

By VISHNU

Last Rated On 04 Oct 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : PD Lansdown

General

Bridge Type : Pedestrain Bridge
Structure No : 0/1
Feature Intersected : MANDAL RIVER
Name of Bridge : BANJADEVI BRIDLE BRIDGE
Nearest Town : BANJADEVI
Latitude (Northing) : 29.65728500
Longitude (Easting) : 78.89100200
Construction Year : 2021
Inventory Year : 2023

Geometric

Overall length (in meter) : 105.00
Total No of Span : 3
Maximuam Span (in meter) : 35.00
Span Arragment : 3X35
No of Lane : 1.000
Overall Width (m) : 2.500
Carriageway Width (m) : 2.200
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Raft
No of Piers : 2
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided