Bridge (ID- 3102 ) Inventory Report

ROPA BRIDLE BRIDGE On Chainage 32.000 of Garjiya (Ghughutiyadhar) Betalghat Kharana Dhokana Odakhan Pasyapani Bhateliya Mukteshwar state highway

Data finalized On 08 Nov 2023

By ANAND LAL

Last Rated On 29 Nov 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : CD Nainital

General

Bridge Type : Pedestrain Bridge
Structure No : 32/1
Feature Intersected : KOSI REVER
Name of Bridge : ROPA BRIDLE BRIDGE
Nearest Town : Betalghat
Latitude (Northing) : 29.55000000
Longitude (Easting) : 79.33340000
Construction Year : 2022
Inventory Year : 2023

Geometric

Overall length (in meter) : 125.00
Total No of Span : 2
Maximuam Span (in meter) : 62.50
Span Arragment : 2*62.5
No of Lane : 1.000
Overall Width (m) : 2.100
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.100
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 1
Abutment Type : RCC Box type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided