Bridge (ID- 3107 ) Inventory Report

Jagatpur Khadar On Chainage 0.850 of Jagatpur-Khadar-Dhudli Motor Road

Data finalized On 02 Aug 2023

By Er. Madan Mohan Joshi

Last Rated On 14 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : PD Dehradun

General

Bridge Type : Motor Bridge High Level
Structure No : Km 01 H.M. 8/10
Feature Intersected : Local River
Name of Bridge : Jagatpur Khadar
Nearest Town : Tilwari
Latitude (Northing) : 30.41040000
Longitude (Easting) : 77.92540000
Construction Year : 2000
Inventory Year : 2023

Geometric

Overall length (in meter) : 11.50
Total No of Span : 1
Maximuam Span (in meter) : 11.50
Span Arragment : 1x1
No of Lane : 1.500
Overall Width (m) : 5.400
Carriageway Width (m) : 4.600
RS Footpath Width (m) : 0.400
LS Footpath Width (m) : 0.400
Approch Width i/c Shoulders (m) : 4.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work required
Floor Protection on Down-stream : protection work required
Tratment for Corrosion Protection (if any) : no special treatment provided