Bridge (ID- 312 ) Inventory Report

RCC motor bridge Ujjawalpur-Bainoli motor road in Km.3 On Chainage 2.500 of Ujjwalpur Bainoli motor road

Data finalized On 05 Jan 2024

By Vipin Kumar

Last Rated On 15 Jun 2024

Rating 0.58%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : TD Gaucher

General

Bridge Type : Motor Bridge High Level
Structure No : 3/1
Feature Intersected : Local Gadhera
Name of Bridge : RCC motor bridge Ujjawalpur-Bainoli motor road in Km.3
Nearest Town : Adibadri
Latitude (Northing) : 30.18300200
Longitude (Easting) : 79.21721400
Construction Year : 2016
Inventory Year : 2022

Geometric

Overall length (in meter) : 8.00
Total No of Span : 1
Maximuam Span (in meter) : 8.00
Span Arragment : 1x8
No of Lane : 1.000
Overall Width (m) : 4.250
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided