Bridge (ID- 3120 ) Inventory Report

Rishi suspension bridge On Chainage 1.000 of Kheta Gugaleshwar Motor Road (VR)

Data finalized On 05 Jan 2024

By Prasant Chandola

Last Rated On 09 Jul 2026

Rating 0.19%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : CD Tharali

General

Bridge Type : Pedestrain Bridge
Structure No : 1/2
Feature Intersected : pinder
Name of Bridge : Rishi suspension bridge
Nearest Town : Rishi suspension bridge
Latitude (Northing) : 30.02277800
Longitude (Easting) : 79.71722200
Construction Year : 1990
Inventory Year : 2023
Work Code(s) : --

Geometric

Overall length (in meter) : 80.00
Total No of Span : 1
Maximuam Span (in meter) : 80.00
Span Arragment : 1x80
No of Lane : 1.000
Overall Width (m) : 2.500
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Severe
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided