Bridge (ID- 3121 ) Inventory Report

Chhhinka suspention bridge On Chainage 0.350 of Chnika Inter College Bridle road

Data finalized On 04 Jan 2024

By Er Dhani Lal Sah (JE), Er Gyanender Chaudhary (AE)

Last Rated On 04 Dec 2023

Rating 14.89%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : PD Gopeshwar

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Alaknanda
Name of Bridge : Chhhinka suspention bridge
Nearest Town : Chamoli
Latitude (Northing) : 30.69280200
Longitude (Easting) : 79.61809000
Construction Year : 1966
Inventory Year : 2023

Geometric

Overall length (in meter) : 105.00
Total No of Span : 1
Maximuam Span (in meter) : 75.00
Span Arragment : 1x75
No of Lane : 1.000
Overall Width (m) : 1.830
Carriageway Width (m) : 1.830
RS Footpath Width (m) : 2.000
LS Footpath Width (m) : 2.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : protection work provided
Bank Protection Right Side of Down-stream : protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided