General

Bridge Type : Motor Bridge High Level
Structure No : 27/2
Feature Intersected : Kosi River Feeder Canal
Name of Bridge : Feeder Canal
Nearest Town : Ramnagar
Latitude (Northing) : 29.39016200
Longitude (Easting) : 79.12844300
Construction Year : 1972
Inventory Year : 2023

Geometric

Overall length (in meter) : 9.00
Total No of Span : 3
Maximuam Span (in meter) : 9.00
Span Arragment : 1x3+1x3+1x3
No of Lane : 2.000
Overall Width (m) : 7.000
Carriageway Width (m) : 7.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 11.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Arch
Superstructure Material : Composite
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : Stone Masonry
Pier Type : Stone Masonry

Protection Work

Bank Protection Left Side of Up-stream : Gabian in three row provided
Bank Protection Right Side of Up-stream : Gabian in three row provided
Bank Protection Left Side of Down-stream : Gabian in three row provided
Bank Protection Right Side of Down-stream : Gabian in three row provided
Floor Protection on Up-stream : Cut-off wall and apron provided
Floor Protection on Down-stream : Cut-off wall and apron provided
Tratment for Corrosion Protection (if any) : Cut-off wall and apron provided