Bridge (ID- 3205 ) Inventory Report

Bridle Bridge on the old road Kwagar Gadhera of Gram Panchayat Bhatoli

Data finalized On 11 Jan 2024

By Amit Singh Rana

Last Rated On 27 Nov 2024

Rating 0.58%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : PD Karnprayag

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Kwagar Gadhera
Name of Bridge : Bridle Bridge on the old road Kwagar Gadhera of Gram Panchayat Bhatoli
Nearest Town : karnaprayag
Latitude (Northing) : 30.18887000
Longitude (Easting) : 79.23604800
Construction Year : 2016
Inventory Year : 2016

Geometric

Overall length (in meter) : 15.00
Total No of Span : 1
Maximuam Span (in meter) : 15.00
Span Arragment : 1x15
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 1.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum protection
Bank Protection Right Side of Up-stream : Plum protection
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided