Bridge (ID- 3206 ) Inventory Report

Bridle Bridge on Gwad Gadhera on The way of Chatigyala to Thirpak

Data finalized On 11 Jan 2024

By Er. Akshay Tomar

Last Rated On 18 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : PD Karnprayag

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Gwad Gadhera
Name of Bridge : Bridle Bridge on Gwad Gadhera on The way of Chatigyala to Thirpak
Nearest Town : Nandprayag
Latitude (Northing) : 30.29747500
Longitude (Easting) : 79.33840300
Construction Year : 2023
Inventory Year : 2023

Geometric

Overall length (in meter) : 14.40
Total No of Span : 1
Maximuam Span (in meter) : 14.40
Span Arragment : 1x14.40
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 1.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum & Gabions protection
Bank Protection Right Side of Up-stream : Plum & Gabions protection
Bank Protection Left Side of Down-stream : Plum protection
Bank Protection Right Side of Down-stream : Plum protection
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided